EIL

EPCC-06 PACKAGE SULPHUR RECOVERY BLOCKEQUIPMENT: Heat Exchanger (AES) OBJECTIVE: To check mechanical strength of pressure parts and support structure of stacked equipment. Perform FEA for process nozzles. DELIVERABLES: 2-D Drawings, Mechanical calculation as per ASME Sec. VIII Div. 1, FEA BUSINESS OUTCOME: Our client could submit the detailed drawing along with mechanical Calculation and FEA…

EPCC-06 PACKAGE SULPHUR RECOVERY BLOCK

EPCC-06 PACKAGE SULPHUR RECOVERY BLOCKEQUIPMENT: Column OBJECTIVE: Perform mechanical design of the equipment which includes wind, seismic effect, nozzle load effects, rigging analysis, transportation check and perform the Finite element analysis for out of preview of convention check. DELIVERABLES: 2-D fabrication Drawings, Mechanical design, FE analysis report with analysis file. BUSINESS OUTCOME: Our client could…

Serpentina FPSO Facility, Equatorial Guinea By ExxonMobil

Serpentina FPSO Facility, Equatorial Guinea by ExxonMobilEQUIPMENT: Vacuum equipment [First separator (Cyclone type)] OBJECTIVE: To check mechanical strength of pressure parts and support structure. Perform FEA for those elements which are out of scope of standard design procedure as per ASME Sec. VIII Div. 1 (nozzle load verification while operation) DELIVERABLES: 3-D CAD Model, 2-D…