EPCC-06 PACKAGE SULPHUR RECOVERY BLOCK

EQUIPMENT: Heat Exchanger (AES)

OBJECTIVE: To check mechanical strength of pressure parts and support structure of stacked equipment. Perform FEA for process nozzles.

DELIVERABLES: 2-D Drawings,

Mechanical calculation as per ASME Sec. VIII Div. 1, FEA

BUSINESS OUTCOME: Our client could submit the detailed drawing along with mechanical Calculation and FEA of critical element like Process nozzles and based on approval they could have proceed for final production to meet project dead lines.

Detail deliverables

  • Mechanical design according to ASME Sec. VIII Div. 1
  • Road transportation design check
  • Rigging analysis
  • Cleat load analysis (WRC 107/537 & FEA)
  • Detail fabrication drawing